THERMAL POWER STATION FOR LIVE STEAM PRODUCTION OF EP-300 UNIT
APPLICATIONThe thermal power station is designed for production of live steam, electric energy and desalinated water for process needs of the petroleum processing plant. STRUCTURE The thermal power station includes two steam boilers with gas-pulse clearing of heating surfaces and total productivity 200 tons of live steam per an hour (140 kgf/cm2, 540°Ñ), a turbine unit with electric capacity 18 MW, and equipment for water demineralization. AMOUNT OF WORKS Turn-key construction of the thermal power station, including construction and installation of: ACS The created power unit is equipped with a distributed steam generation process control system. ACS of the thermal power station is constructed on YOKOGAWA equipment. All the equipment located in the operation zone has explosion-proof design. The unit has Rostekhnadzor license for application in Russia, certificates of Gosstandart of the Russian Federation. THERMAL POWER STATION SPECIFICATIONS
|
||||||||||||||||||||
|
The company carries out delivery, start-up operations and maintenance personnel training. The equipment is delivered within 12 months from the date of contract execution and prepayment. |
||||||||||||||||||||